May 19, 2025
ElecLink interconnector between France and UK suspends operations for two weeks
Investing.com -- The ElecLink, an electrical interconnector between France and Britain, is set to suspend operations for two weeks until June 2.
The suspension comes as a result of a minor misalignment in the cable, as reported by the Channel Tunnel operator, Getlink, on Monday.
Getlink discovered the issue in a limited area outside the tunnel in Britain.
The company has estimated that the commercial impact of the suspension will be approximately 20 million euros ($22.4 million).
This article was generated with the support of AI and reviewed by an editor. For more information see our T&C.